Installation - Frame Fitting

There are two fixing methods for the frame, either into timber framework down either side of the MMD frame or suspended via threaded rods.

Option 1 - Timber Installation

  1. Lift the frame into position in the space created between the timber frame work. (Details of cut-out sizes can be found on the online CAD drawings for the MMDv2)

  2. The base of the frame should sit 36mm [1.4”] above the finish ceiling level. Measure this height and then fix the frame into the wood frame using the fixing holes in the 4 side corner plates.

⚠️ Fixing size and number should be used to hold the relevant combined weight of the mount, projector and lens. The installer is responsible for ensuring adequate number and sized fixings are used.

get?access_key=eyJpdiI6IllCNjI1L2VFU0NDN0lUSnFnUUM0REE9PSIsInZhbHVlIjoiajFKdERiZk56YnBvM2NOakN6UzIrcndkaXJmNkdZUDJzbG51NXpEUWJmdVVsY0hyMzE3R2ovTmJJdTJDZU12VG5HUXVmTEJLY0hXTWFUVnZyV0t0SGlFZ2c2S2NSWno4WVdQaFZtc01TVE09IiwibWFjIjoiNTA5ZDVmOGU3NWJlOGE2MGVmNTgzYTZhZWMxZjhjYWNhN2UwOWZjNDM2NGRhZTg4ZTViMmQ5YjMzY2M2MjUxNyIsInRhZyI6IiJ9&path=item-files%2F59727%2Fc01gvRCOj7pqWwcLSO2y9CoKVW5JrHtg3pU8bVMy.png&signature=e1ae51d12e89b885bfd9deedf51dd5315395aa950187f67b5551fb46b2474860Figure 3 - Projector Frame Fixing Locations

  1. Use spirit level to check the frame is level and double check the distance from the frame base to the finished ceiling it 36mm [1.4”]. If required adjust as necessary.

Option 2 – Threaded Rod Installation

  1. Lift the frame into position in the space created in the ceiling. (Details of cut-out sizes can be found on the online CAD drawings for the MMD-S). Locate the frame onto the threaded rods installed to fix the frame to.

  2. The base of the frame should sit 36mm [1.4”] above the finish ceiling level. Measure this height and then fix the frame onto the metal rods.

⚠️ Fixing size and number should be used to hold the relevant combined weight of the mount, projector and lens. The installer is responsible for ensuring adequate number and sized fixings are used.

get?access_key=eyJpdiI6IlBuaFRmNjY0dGRJN0NxTnpsc3VMNVE9PSIsInZhbHVlIjoiL2VYd0ozMlZUaEFFMTRNdU0xek9uYnJxU1lUcWEyQWNlWkhQY0E4akYxbUVuT3g2bmp0cC9kc24xK2F0aWZQQktiaktkYVJWckV0dEdudTJRa1A4ZHBKS0lBZ3I2c1p4UEhteGN1RDkyUE09IiwibWFjIjoiZTUxYmQ2OGMwMzg5MjcwMWNkZDQ0Yjk0MTk1ODRiMjBiOGZjOWI0OTliZTYzZGY4ZDBhMTljNGJjOTFmYzRhNSIsInRhZyI6IiJ9&path=item-files%2F59727%2FVwbSO8MD6MpvIBVUYFD5XBBeDzc1U4OMi8nFlHdS.png&signature=d72c37b7f763a59aa93ee8a7d3329c057ec345e263ff6ca657de0f77ecf20499Figure 4 – Threaded Rod Hanging Points

  1. Use spirit level to check the frame is level and double check the distance from the frame base to the finished ceiling it 36mm [1.4”]. If required adjust as necessary.